We have been awarded a contract on behalf of William Anelay Ltd to carry out various groundworks at Bramhall Hall Stockport on a refurb project they have recently procured. Our various types of groundworks include but are not limited to the following work types, new drainage, excavation of existing floor slabs and replacing with new Power Floated concrete floor slabs to the internal floors of the building and laying new and existing York Stone paving flags, excavate and pour new concrete footings to allow for the new build extension that will form part of the new Tea Room.

As Bramhall Hall is a Grade 1 listed building this particular contract will require our TLC factor that we at Byrne Civil Solutions give all our projects, leaving our clients safe in the knowledge that they have a quality partner to carry out these essential works. Contract Value £200,000