Medlock School MUGA Pitch

Client: 
Cruden Group

This project involved the construction a Multi Use Games Area (MUGA) pitch at a school in Ardwick.

This entailed the installation of a herringbone land drain system with inline silt trap and the construction of a concrete edged permeable tarmac pitch. This was then overlaid with a permeable polymeric surface and the whole pitch surrounded by new mesh fencing and gates.

The whole project was constructed to meet Sport England MUGA Pitch specification.